Major Reference


1. Nuclear Power Plant

Period Description Client Contractor
Jun. 1979 – Nov. 1980 PWHT for the Boiler Feeder Tube, steel Structures of Turbine room at #1 unit WolSung Nuclear Power Plant Atomic Energy of Canada, Ltd. Halla Const. Co.,Ltd./
Cooperheat
Apr. 1983 – Apr. 1985 PWHT for the Steam Pipe, Water Pipe and Turbine Pipe at #3, #4 unit KoRi Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd.
Nov. 1980 – Aug 1985 Pre-Heating, PWHT of the Steam Generator, Pressurizer Vessel for #3, #4 unit of KoRi Nuclear Power Plant Westinghouse HyunDai Heavy Ind. Co., Ltd/
Cooperheat/
Heat Eng. Inc.,
Aug. 1984 – Apr. 1986 PWHT for Steam Pipe, Water Pipe and Turbine Pipe at #1, #2 unit YoungKwang Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd.
Jan. 1986 – Dec. 1988 PWHT for the Steam Pipe, Water Pipe and Turbine Pipe at #1, #2 unit UlJin Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd./
DongA Eng. & Const. Co., Ltd.
Jul. 1986 – Aug. 1986 Pre-Heating, PWHT of the Pressurizer Vessel for #2 unit of YoungKwang Nuclear Power Plant Westinghouse Heat Eng. Inc.,
Jun. 1991 - Mar. 1993 PWHT for the Steam Generator, Reactor Vessels, support column and cold leg pipe, turbine generator, the stacks, turbine generator building at #3, #4 unit of YoungKwang Nuclear Power Plant Korea Electric Power Corp. Hanjung Corp./
HyunDai Eng. & Const. Co., Ltd.
Feb. 1992 – Apr. 1995 Pre-Heating, PWHT for the main facilities Pipe at #3, #4 unit YoungKwang Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd./
Hanjung Corp.
Aug. 1993 – Jul. 1996 Pre-Heating, PWHT of the Steam Generator for #2, #3, #4 unit of WolSung Nuclear Power Plant Korea Electric Power Corp. Hanjung Corp.
May. 1993 - May. 1995 Pre-Heating, PWHT of the Steam Generator and other 2 Pressure Vessules for #3, #4 unit of UlJin Nuclear Power Plant Korea Electric Power Corp. Hanjung Corp.
May. 1994 – Dec. 1998 PWHT for the main facilities Pipe at #2, #3, #4 unit WolSung Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd./
DaeWoo Eng. & Const . Co., Ltd.
Dec. 1995 – Dec. 1997 Pre-Heating, PWHT for the main facilities Pipe at #3, #4 unit UlJin Nuclear Power Plant Korea Electric Power Corp. DongA Eng. & Const. Co., Ltd.
Jul. 1996 – Dec. 1997 Pre-Heating, PWHT of the steam generator for #1 unit of KoRi Nuclear Power Plant Korea Electric Power Corp. Hanjung Corp.
Mar. 1997 – Sep. 1999 Pre-Heating, PWHT of the #5, #6 unit steam generator and other Nuclear Vessels for YoungKwang Nuclear Power Plant Korea Electric Power Corp. Hanjung Corp.
Mar. 1998 – Dec. 1998 Pre-Heating, PWHT for the Steam pipes, Water pipes under replacing job for the Steam Generator at #1 unit KoRi Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd.
Oct. 1998 – Dec. 2002 Pre-Heating, PWHT for the main facilities Pipe at #5, #6 unit YoungKwang Nuclear Power Plant Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd.
May. 1999 – Sep. 2002 Pre-Heating, PWHT of the #1, #2 unit NSSS lower vessel assembly for JinSan Nuclear Power Plant - Hanjung Corp.
Oct. 1999 – Nov. 2002 Pre-Heating, PWHT of #5, #6 unit steam generator and other Nuclear Vessels for UlJin Nuclear Power Plant Korea Electric Power Corp. DooSan Heavy Ind. Co., Ltd.
Mar. 2001 – Dec. 2002 Pre-Heating, PWHT of #2 NSSS Vessel for Sequo-yah Nuclear Power Plant - DooSan Heavy Ind. Co., Ltd.
Apr. 2003 - Nov. 2003 Pre-Heating, PWHT for the Turbine at #6 unit UlJin Nuclear Power Plant Korea Electric Power Corp. DooSan Heavy Ind. Co., Ltd.
Jan. 2003 - Jun. 2004 Pre-Heating, PWHT of 4 sets of S/G for #1, #2 unit of KEDO Nuclear Power Plant KEDO DooSan Heavy Ind. Co., Ltd.
Jan. 2004 - Feb. 2009 Pre-Heating, PWHT of 4 sets of S/G, Reactor Vesselfor #1, #2 unit of Shin Kori Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd. DooSan Heavy Ind. Co., Ltd.
Mar. 2004 - Jun. 2005 Pre-Heating, PWHT of RSG for Watts Bar Nuclear Power Plant #1 unit Korea Hydro & Nuclear Co., Ltd. DooSan Heavy Ind. Co., Ltd.
Sep. 2005 - May 2010 Pre-Heating, PWHT of 4 sets of S/G for #1, #2 unit of Shin Wolsong Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd. DooSan Heavy Ind. Co., Ltd.
Nov. 2008 - Aug. 2010 Pre-Heating, PWHT of 4 sets of RSG for #1, #2 Unit of sequoia Nuclear Power Plant - DooSan Heavy Ind. Co., Ltd.
Sep. 2009 - May. 2011 Pre-Heating, PWHT of 4sets of S/G for #3,#4 UNIT OF Shin Kori Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd. DooSan Heavy Ind. Co., Ltd.
2010. 05. – 2011. 12. Sanmen, Haiyang 원자력발전소 AP1000 S/G 4set 예열, PWHT Westing-house 두산중공업㈜
Nov. 2010 - Dec. 2011 Pre-Heating, PWHT of 3sets of RSG for #1, #2 Uljin Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd. DooSan Heavy Ind. Co., Ltd.
Apr. 2010 – Jan. 2017 Pre-Heating, PWHT for main facilities Pipe at shin Kori #3, #4 Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd HyunDai Eng. & Const. Co., Ltd.
May 2010 - Oct. 2013 Pre-Heating, PWHT of 4sets of S/G for AP1000 China(Vogtle, Sanmen, Haiyang) Westinghouse Nuclear Dept. DooSan Heavy Ind. Co., Ltd.
Jun. 2011 - Oct. 2012 Pre-Heating, PHWT of facility for RCP Project KAERI KAERI
Aug. 2013 -Present PWHT for main facilities Pipe at UAE #1, #2, #3, #4 Braka Nuclear Power Plant Project Korea Electric Power Corp. HyunDai Eng. & Const. Co., Ltd.
Mar. 2013 –Aug. 2018 Pre-Heating, PWHT for main facilities Pipe at shin Uljin #1, #2 Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd HyunDai Eng. & Const. Co., Ltd.
Mar. 2018. – Apr. 2018 NDT for overhaul project of Weolsung #2 Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd KEPCO KPS
Aug. 2018. – Nov. 2018 NDT for construction pipe of reactor emergency cooling water of Hanul #1 Nuclear Power Plant Korea Hydro & Nuclear Co., Ltd KEPCO KPS

2. Thermal and Other Power Plant

Period Description Client Contractor
Feb. 1982 – Jul. 1982 PWHT for the steam pipe at North JeJu Thermal Power Plant Korea Electric Power Corp. Hanjung Corp.
May. 1982 – Jan. 1984 Pre-Heating, PWHT for the pipe under the main facilities machinery job at BoRyung Thermal Power Plant Korea Electric Power Corp. DaeLim Ind. Co., Ltd.
Jan. 1984 – Feb. 1985 Pre-Heating for the hydraulic pipe at SamRyang Jin Water Power Plant Korea Electric Power Corp. Hanjung Corp.
Jan. 1988 – Mar. 1989 PWHT for the steam. Water and turbine pipe at BanWol Steam Supply and Power Plant Pan-wol Ind. Complex Hanjung Corp.
Feb. 1988 – Jul. 1990 Pre-Heating for the hydraulic pipe at KangReung Water Power Plant Korea Electric Power Corp. Hanjung Corp.
Dec. 1991 – Feb. 1992 PWHT for #5 unit the boiler integral pipe at BoRyeong Thermal Power Plant Korea Electric Power Corp. Hanjung Corp.
Feb. 1992 – Feb. 1994 Pre-Heating for the hydraulic pipe at MuJu Water Power Plant Korea Electric Power Corp. Hanjung Corp.
Jun. 1992 – Jun. 1993 PWHT for #1, #2 unit the boiler header at TaiAn Thermal Power Plant Korea Electric Power Corp. Hanjung Corp.
Jan. 1995 – Mar. 2001. PWHT for #1, #2, #3, #4, #5 unit the pipe at HaDong Thermal Power Plant Korea Electric Power Corp. Hanjung Corp.
Dec. 1997 – Mar. 2001 PWHT for #1, #2, #4 unit the boiler and turbine pipe at DangJin Thermal Power Plant Korea Electric Power Corp. DongA Eng. & Const. Co., Ltd.
Aug. 1998 – Sep. 1999 PWHT for the pipe in 3rd stage construction job at KwangYang Combined Cycle Power Plant POSCO POSCO Development Co., Ltd.
Dec. 1998 – Oct. 1999 Pre-Heating for the hydraulic pipe at SanChung Water Power Plant Yuchang Plant Co., Ltd DongA Eng. & Const. Co., Ltd.
Dec. 1999 – Feb. 2001 PWHT for the pipe in LNG power generation facilities 3rd stage construction job at PoHang POSCO POSCO Development Co., Ltd.
Dec. 1999 – Apr. 2002 PWHT for #5, #6 unit the boiler, T/G pipe at TaiAn Thermal Power Plant Korea Electric Power Corp. LG Eng. & Const. Co., Ltd.
Aug. 2001 - Feb. 2004 PWHT for #1, #2 unit the boiler, T/G pipe at YoungHeung Thermal Power Plant Korea Electric Power Corp. SeokWon Ind./
CheongJin Const./td>
Mar. 2002 - Nov. 2003 PWHT for the pipe at BuSan Combined cycle Power Plant Korea Southern Power Co., Ltd. HyunDai Eng. & Const. Co., Ltd.
Mar. 2003 - Aug. 2003 Pre-Heating, PWHT for the pipe at KumHo Steam Supply and Power Plant Kumho Petrochemical Corp. SamJin Heavy Ind. Co., Ltd..
Feb. 2004 - Dec. 2006 Pre-Heating, PWHT for #5, #6, #7, #8 unit the pipe at DangJin Thermal Power Plant KEWP Co., Ltd. YuChang Plant Co., Ltd./
Seongchang Plant Co., Ltd.
Apr. 2004 - Feb. 2005 Pre-Heating, PWHT for the pipe at YulChon Combined Cycle Power Plant HyunDai Eng. & Const. Co., Ltd. HyunDai Eng. & Const. Co., Ltd.
Aug. 2004 - Jun. 2005 Pre-Heating for the hydraulic pipe at ChungSong Water Power Plant Korea Western Power Co., Ltd. YuChang Plant Co., Ltd
Oct. 2005 - Sep. 2007 Pre-Heating, PWHT for #3, #4 unit Boiler, Plant processing pipe at YoungHeung Thermal Power Plant KSEP Co., Ltd. SamJin Const.,/
WooLim Plant&Seil Machinery Co., Ltd.
Dec. 2005 - Feb.2008 PWHT for the pipes at Combined Cycle power plant in Zawia, Libya General Electric Co. in Libya HyunDai Eng & Const. Co., Ltd.
Aug. 2007 - Nov.2008 Pre-Heating, PWHT for #8 unit plant processing Pipe of Hadong Thermal Power Plant KEWP Co., Ltd. YuChang Plant Co., Ltd
Dec. 2008 - Dec. 2014 PWHT for the pipe & facility in Qatar Ras Laffan C IWPP Project Ras Girtas Power Co. Hyundai eng & Const. Co., Ltd./
DooSan Heavy Ind. Co., Ltd.
Dec. 2009 – May. 2011 Pre-Heating, PWHT for the pipe at InCheon Posco Power LNG Combined Cycle Power Plant Posco Power Corp. Posco Eng. & Const. Co., Ltd
Jan. 2010 - Apr. 2010 Pre-Heating, PWHT for the pipe at KwangYang Mill Line Descaling Project - DongJin Eng. & Const. Co., Ltd
Jul. 2010 - Aug. 2014 PWHT for the pipes & facility in Libya Al Khalij Combined Cycle power plant GECOL HyunDai Eng & Const. Co., Ltd/
Doosan Heavy Ind.& Const. Co., Ltd
Apr. 2011 -Dec. 2014 PWHT for the pipe in Koniambo Nickel Power Plant Project Xstrata DooSan Heavy Ind. Co., Ltd.
Aug. 2012 - Jul. 2014 PWHT for the pipe & facility in Vietnam Mong Duong II Thermal Power Plant EVN DooSan Heavy Ind. Co., Ltd.
Mar. 2013 -Jul. 2014 PWHT for the pipe in Pohang Combined Cycle Power Plant POSCO GS Neotek Co., Ltd.
Oct. 2013 -Jun. 2015 PWHT for the pipe & facility in Turkey Tufanbeyli TP Project Enerjisa Enerji Uretim A.S. SK Eng. & Const. Co., Ltd.
Nov. 2013 -Jun. 2015 PWHT, NDT for the pipe, tank & facility in Philippines SM200 Phase 1 Project CONAL Holdings Co. Daelim Ind. Co., Ltd.
Nov. 2013 - Dec. 2013 PWHT for the pipe & facility in Israel IEC add-on Project Israel Electric Corporation DooSan Eng & Const. Co., Ltd.
Jan. 2014 - Dec. 2014 PWHT for the unit the plant processing boiler & pipe in Boryung Combined Cycle Power Plant Korea Midland Power Co., Ltd. Korea Midland Power Co., Ltd.
Apr. 2014 - Mar. 2016 PWHT, NDT for the pipe, tank & facility in Bukpyeong Hermal Power Plant Project STX Electric Power Corp. STX Electric Power Corp.
Jul. 2015 – Jan. 2018 NDT for the pipe, tank & facility in Sarulla Geothermal Power Plant Project Sarulla Operations Ltd. HyunDai Eng & Const. Co., Ltd.
Apr. 2015 - Nov. 2015 NDT for the pipe, tank & facility in Taean Thermal Power Plant Project Korea Wester Power Co., Ltd. Samsung C&T
May. 2016 – Jul. 2018 PWHT for boiler and Turbine at #1 ~ #8 overhaul project of HaDong Thermal Power Plant Korea Southern Power Co., Ltd. Korea Southern Power Co., Ltd.
May. 2017 – May. 2018 NDT(PAUT) for water intake pipe and Coal Silo at Shin Seocheon Thermal Power Plant Korea Midland Power Co., Ltd. Korea Midland Power Co., Ltd.
Oct. 2017 – Dec. 2017 NDT for safety inspection of tank at Ha-dong Thermal Power Plant Korea Southern Power Co., Ltd. Korea Southern Power Co., Ltd.
May. 2018 – Jun. 2018 NDT for overhaul project of Paju CCPP Korea District Heating Corp. KEPCO KPS
Jul. 2017 – Present NDT for construction project of heat storaging tank Korea District Heating Corp. Lotte E&C
Oct. 2018 – Present PWHT for boiler and Turbine at #1 ~ #8 overhaul project of HaDong Thermal Power Plant Korea Southern Power Co., Ltd. Korea Southern Power Co., Ltd.

3. GAS & Oil Chemical Plant

Period Description Client Contractor
Aug. 1989 - Present PWHT for the pipe & facility in Yeosu GS-Caltex Corp. GS-Caltex Corp.
Dec. 1979 – Dec. 1979 PWHT for the pipe in the extension job installation at Busan Oil refinery plant of KeukDong Oil Refinery Co. Kukdong Oil Refinery Co., Ltd. Kukdong Oil Refinery Co., Ltd.
Apr. 1980 – Jun. 1980 PWHT for the pipe in the P/A plant new establishment job at YeoCheon plant of KumHo Petrochemical Co. Kumho Petro-Chemical Co., Ltd. Kumho Petro-Chemical Co., Ltd.
Jul. 1980 – Aug. 1980 PWHT for the pipe in the repair and maintenance job at YeoCheon Plant of NamHae Chem. Namhae Chemical Co., Ltd. ShinHwa Const. Co., Ltd.
Jun. 1984 – Jul. 1984 PWHT for the pipe in No.2 C/U project at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Sep. 1984 - Oct. 1984 PWHT for the pipe under NO.1 C/U heater at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Jan. 1985 - May. 1985 PWHT for the pipe under New Aromatics Complex Construction job at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Apr. 1985 - Aug. 1985 PWHT for the pipe in M & I project at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Jul. 1988 - Aug. 1988 PWHT for the pipe under kerosene project at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Jul. 1988 - Mar. 1989 PWHT for the BTX, Off-site, Compressor area pipe in Ethylene #2 project at YeoSu plant of HoNam Ethylene Honam Ethylene Co., Ltd. DaeLim Ind. Co., Ltd.
Dec. 1988 - Sep. 1989 PWHT for the On-site/Off-Site pipe in New Ethylene project at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Apr. 1989 - May. 1989 PWHT for the pipe in LAB 20,000 Ton/Year new establishment construction at UISan plant of lsu Chem. Isu Petro-Chemical Co., Ltd. ShinHan Const. Co., Ltd.
Jan. 1990 - Feb. 1990 PWHT for the pipe in YeoSu PE plant of LG Chem. LG Chemical Corp. LG Develop. Co., Ltd.
Feb. 1990 - Apr. 1991 PWHT for the pipe in Power facilities increase construction at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Mar. 1990 - Jun. 1990 PWHT for the P/A field Pipe in YeoSu plant of KumHo Shell Corp. Kumho-Shell Corp. Kumho-Shell Corp.
May. 1990 - Sep.1991 Pre-Heating, PWHT for the pipe in LPC-NC project at YeoSu Plant of LG Petrochemical LG Petro-Chemical Corp. LG Petro-Chemical Corp.
Oct. 1990 - Oct.1990 PWHT for the pipe in the manufacturing construction at NamHae Chemical Namhae Chemical Co., Ltd. SK Eng. & Const. Co., Ltd.
Oct. 1990 - Mar. 1991 PWHT for the convection coil at YeoSu plant of HoNam Petrochemical Honam Petro-Chemical Corp. HanKook Fertilizer Co., Ltd.
Nov. 1990 - Dec. 1991 Pre-Heating, PWHT for the pipe in Increase construction at inCheon Oil Refinery Plant of Kyungin Energy Kyongin Energy Co., Ltd. DaeLim Ind. Co., Ltd.
Dec. 1990 - Jan. 1991 PWHT for the S/D pipe in YeoSu Plant of HoNam Ethylene Honam Ethylene Co., Ltd. Honam Ethylene Co., Ltd.
Dec. 1990 - Apr.1991 PWHT for the pipe at DaeSan Plant of HyunDai Petrochemical Co. Hyundai Petro-Chemical Co., Ltd. HyunDai Eng. & Const. Co., Ltd.
Mar. 1991 - Jan.1992 PWHT for the steam line, HOU IBL #7 unit, HOU OBL pipe at UISan Oil Refinery Plant of SK Corp. SK Corp. SK Eng. & Const. Co., Ltd.
Oct. 1991 - Mar. 1992 PWHT for NCC pipe at YeoSu plant of HanYang Chem. Han-Yang Chemical Co., Ltd. SamSung Eng. & Const. Co., Ltd.
Feb. 1992 - Jul. 1992 Pre-Heating, PWHT for BTX pipe at YeoSu plant of LG Petrochemical LG Petro-Chemical Corp. LG Petro-Chemical Corp.
Sep. 1992 - Mar. 1993 PWHT for the TEC/CAPC heater tube at HanKook Fertilizer Korea Fertilizer Co., Ltd. Korea Fertilizer Co., Ltd.
Sep. 1995 - Nov. 1996 Pre-Heating, PWHT for No.5 CDU project pipe at UISan Oil Refinery Plant of SK Corp. SK Corp. ShinHwa Eng, & Const. Co., Ltd.
Dec. 1996 - Sep. 1997 PWHT for Ethylene, BRU pipe at DaeSan Plant of HyunDai Petrochemical Hyundai Petro-Chemical Co., Ltd. Hyundai Petro-Chemical Co., Ltd.
Nov. 1999 - Jul. 2002 PWHT for the pipe in Qatar NODCO Refinery expansion project National Oil LG Eng. & Const. Co., Ltd.
Dec. 1999 - Dec. 2002 PWHT for the pipe in Iran South Pars Project Phase #2, #3 on-shore facility construction NIOC -Pars Oil & Gas HyunDai Eng. & Const. Co., Ltd.
Jul. 2000 - Jan. 2003 PWHT for the pipe in Qatar QGPC NGL#4 gas plant construction project Qatar General Petroleum Corp. HyunDai Eng. & Const. Co., Ltd.
Jan. 2001 - Fed. 2002 PWHT for the pipe in Kuwait KNPC New GOD project Kuwait National Petroleum Company LG Eng. & Const. Co., Ltd.
Feb. 2002 - Mar. 2003 Heat Treatment for #3 PX Project pipe at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG Eng. & Const. Co., Ltd.
Jan. 2003 - May. 2005 PWHT for the pipe in Iran South Pars Project Phase #4, #5 on-shore facility construction NIOC -Pars Oil & Gas HyunDai Eng & Const. Co., Ltd.
Mar. 2003 – Apr. 2003 Pre-Heating, PWHT for the pipe in YeoSu NCC plant Modification Construction Yeochoen NCC Corp. IIYang Const. Co., Ltd.
Aug. 2003 – Oct. 2005 Pre-Heating, PWHT for Western Libya Gas Project NC41 On-shore Mellitah Plant Construction AGIP Gas BV HyunDai Eng & Const. Co., Ltd.
Oct. 2003 - Dec. 2003 PWHT for the high temperature pipe related to T/A Process at YeoSu S.M plant LG Chemical Co., Ltd. LG Chemical Co., Ltd.
Apr. 2004 - Sep. 2005 Pre-Heating, PWHT for the pipe in HYPOL Project at KumHo Petrochemical KumHo Chemical Co., Ltd. WooSung Plant Co., Ltd.
Oct. 2004 - Aug. 2007 PWHT & NDT for the pipe in Iran South Pars Project Phase #6.7 & 8 on-shore facility construction NIOC -Pars Oil & Gas DaeLim Ind. Co., Ltd.
Dec. 2004 - Sep. 2005 Pre-Heating, PWHT for the pipe in HDO plant Clear fuel construction Hyundai Oil Bank Co., Ltd. HyunDai Eng. & Const. Co., Ltd.
Dec. 2004 - Mar. 2005 Pre-Heating, PWHT for the pipe in KumHo P&B KPA(Ⅲ) Project Kumho P&B Co., Ltd. IIYang Const. Co., Ltd.
Jun. 2005 – Aug. 2006 Pre-Heating, PWHT & NDT for the pipe in China LIDONG Aromatics Complex Project GS Lidong Chem. Co., Ltd. GS Eng. & Const. Co., Ltd.
May. 2006 – May. 2008 Pre-Heating, PWHT for the pipe in Kuwait New Ethane Recovery Plant Project KNPC HyunDai Eng & Const. Co., Ltd.
May. 2007 - Jun. 2009 Pre-Heating, PWHT & NDT for the pipe, tank & facility in Oman Sohar Aromatics Project Aromatics Oman LLC GS E&C Co., Ltd.
Apr. 2007 - Apr. 2011 Pre-Heating, PWHT for the pipe, tank & facility in Qatar GTL-FGP Project Qatar Shell GTL Limited HyunDai Heavy & Ind. Co., Ltd.
Jul. 2007 - Apr. 2011 Pre-Heating, PWHT for the pipe, tank & facility in Qatar GTL-LPU Project Qatar Shell GTL Limited HyunDai Heavy & Ind. Co., Ltd.
Oct. 2007 - Feb. 2009 Pre-Heating, PWHT & NDT, PMI, Hardness test for the pipe & facility in Saudi Khurais Project SAUDI ARAMCO HyunDai Heavy & Ind. Co., Ltd.
Oct. 2007 - May 2010 Pre-Heating, PWHT & NDT for the pipe, tank & facility in Oman Salalah Methanol Proiect Salalah Methanol Co., LLC. GS E&G Co., Ltd.
Feb. 2008 - May. 2008 Pre-Heating, PWHT & NDT in Donghae-1 Gas Platform Modification Project Korea National Oil Corporation Hyundai eng & Const. Co., Ltd.
Feb. 2008 - Jan. 2009 NDT for the pipe manufacture inspection - Daesin Const. Co., Ltd.
Jan. 2009 - Mar. 2011 PWHT for the pipe & facility in Qatar QAFCO-5 Project Qatar Fertilizer Co. Hyundai eng & Const. Co., Ltd.
Apr. 2009 - Apr. 2011 PWHT & NDT for the pipe, tank & facility in UAE Green Diesel Project Abu Dhabi Oil Refining Co. GS Eng. & Const. Co., Ltd.
Jun. 2009 – Present PWHT for the pipe & facility in Yeosu LG Chem LG Chem
Nov. 2009 - Feb. 2011 PWHT & NDT for Common GHT/RDS Utility Project Hyundai Oil Bank Co., Ltd. Hyundai eng & Const. Co., Ltd.
Mar. 2010 – July. 2012 Per-heating, PWHT, PMI & hardness test for piping in Karan Gas Field Development Project SAUDI ARAMCO Hyundai eng & Const. Co., Ltd.
Aug. 2010 - Dec. 2013 NDT for the piping in UAE Ruwais Refinery Expansion-PKG#2, #7 Project Abu Dhabi Oil Refining Co. GS Eng. & Const. Co., Ltd.
Nov. 2010 - Mar. 2013 PWHT & NDT for pipe, tank & facility in UAE FERTIL2 Ammonia/Urea Expansion Project Ruwais Fertilizer Industries Samsung Eng. Co., Ltd.
Mar. 2011 - Jun. 2012 PWHT for the pipe & facility in Qatar QAFCO-6 Project Qatar Fertilizer Co. Hyundai eng & Const. Co., Ltd.
Jul. 2011 - Dec. 2012 NDT for the pipe in Hyundai RB Hyundai RB Hyundai RB
Nov. 2011 - Oct. 2013 PWHT & NDT for the pipe & facility in UAE Borouge #3 U&O Project Abu Dhabi Polymers Co.,Ltd. Hyundai eng & Const. Co., Ltd.
Jul. 2012 - Dec. 2012 NDT for the Storage tank in Yeosu Tank Terminal Korea National Oil Corporation Korea National Oil Corporation
Dec. 2012 - Oct. 2013 NDT for the piping in New PX Project (OBL) SK Corp. SK Eng. & Const. Co., Ltd.
Mar. 2013 - Jun. 2015 PWHT, NDT for the pipe & facility in Uzbekistan UGCC Project Uz-Kor Gas Chemical LLC GS Eng. & Const. Co., Ltd./
Hyundai eng Co., Ltd./
Samsung eng & const. co., Ltd.
Mar. 2013 -Dec. 2014 PWHT for the piping in Ma'aden Aluminum Refinery Project Ma’aden Bauxite and Alumina Co. Hyundai eng & Const. Co., Ltd.
Jun. 2013 - Jun. 2015 PWHT, NDT for the pipe & facility in Indonesia Cilacap RFCC Project Pertamina GS Eng. & Const. Co., Ltd.
Aug. 2013 -Jul. 2014 PWHT, NDT for the pipe & facility in UAE Inter Refinery Pipelines -Ⅱ Project Abu Dhabi Oil Refining Co. GS Eng. & Const. Co., Ltd.
Jun. 2014 – May. 2017 PWHT, NDT for the pipe & facility in Vietnam Nghi Son Refinery & Petrochemical Complex NSRP Limited JGC/GS/Chiyoda/SK
Dec. 2014 - Nov. 2016 PWHT, NDT for the pipe & facility in ERC Refinery Project Egyptian Refinery Co. GS Eng. & Const. Co., Ltd.
Aug. 2014 - Nov. 2015 PWHT for the pipe & facility in CHP-S1 Project Kumho Mitsui Chemicals Samsung C&T co.
Jan. 2015 - Apr. 2016 PWHT for the pipe & facility in RPLC VERE Project PDVESA TAECHANG ENG
Jul. 2015 - Present PWHT for the pipe & facility in Karbala Refinery Project SCOP HDGSK
Feb. 2016 – Apr. 2018 PWHT, NDT for Kandym Fields Gas Processing Plant Project in Uzbekistan LUKOIL Uzbekistan Operating Company Hyundai engineering
Aug. 2016 – Jul. 2018 PWHT for Residue Upgrading Complex Project of S-OIL S-OIL Daelim co./
Daewooenc.co.
Jun. 2016 – Oct. 2017 PWHT for Lotte Versalis SR project Lotte Versalis Hyundai engineering
Apr. 2017 – Present NDT for overhaul of Kolonindustries factory in Daesan Kolonindustries Kolonindustries
Nov. 2017 - Present PWHT for the Uthmanuyah Gas Construction Project in Saudi Arabia ARAMCO Hyundai eng & Const. Co., Ltd.
Dec. 2017 – Present PWHT for construction work of SDA Project Hyundai Oil Bank Hyundai Oil Bank
Apr. 2018 – Present PWHT for PKG 4 of Hyundai Oil Bank revamp project Hyundai Oil Bank Hyundai eng & Const. Co., Ltd.
Jul. 2018 – Present PWHT for the project of Hanwha Chemical Hanwha eng & Const. Co., Ltd.
Aug. 2018 – Present NDT & PWHT for UTCC construction project in Uzbekistan JSC UZBEKENERGO Hyundai engineering

4. Industrial Plant

Period Description Client Contractor
Nov. 1981 – Feb. 1982 PWHT for NO.1, No.2 H.P heater used for SamCheonPo Thermal Power Plant Korea Electric Power Corp. Hanjung Corp.
Oct. 1983 - Nov. 1983 PWHT for vertical columns Kohap Xylene Co., Ltd. Hanjung Corp.
Oct. 1983 - Nov. 1983 PWHT for the caustic prewash columns at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG-Caltex Corp.
Jan. 1985 – Mar. 1985 PWHT for fired heater at UISan Oil Refinery Plant of SK Corp. SK Corp. Hanjung Corp.
Mar. 1986 – Jun. 1986 Pre-Heating, PWHT for #1 Steel manufacturing plant Electricity Vessel and trunnion ring at KwangYang Steel mill of POSCO POSCO DongA Eng. & Const. Co., Ltd.
Jan. 1986 – Jan. 1986 PWHT for Pressure Vessel at YeoSu Plant of LGCaltex LG-Caltex Corp. KeumSung Electric Wires Co., Ltd.
Apr. 1987 – Jun. 1987 PWHT for Pressure Vessel in KALTIM Ⅲ Project KALTIM HyunDai Heavy Industries Co., Ltd.
May. 1987 – Jun. 1987 PWHT for Pressure Vessel at HoNam Ethylene Honam Ethylene Co., Ltd. KeumSung Electric Wires Co., Ltd.
May. 1987 – Jun. 1987 PWHT for #2 super heater at Keuk Dong Oil Refinery Plant Kukdong Oil Refinery Co., Ltd. HyunDai Heavy Industries Co., Ltd.
Aug. 1987 – Oct. 1987 Pre-Heating, PWHT for #2 Steel manufacturing plant Electricity Vessel and trunnion ring at Kwang Yang Steel mill of POSCO POSCO DongA Eng. & Const. Co., Ltd.
Sep. 1987 - Oct. 1987 PWHT for #2 Coaks plant H2S scrubber tank at KwangYang Steel mill of POSCO POSCO TaeSung Const. Co., Ltd.
Oct. 1988 – Dec. 1988 Pre-Heating, PWHT for a blast furnace at POSCO POSCO HyunDai Eng. & Const. Co., Ltd.
Jan. 1989 – Feb. 1989 PWHT for Pressure Vessel used for LPG Storage TSING-YIPST Hanjung Corp.
Mar. 1989 – Apr. 1989 PWHT for Mothanater (106-D) Pressure Vessel shell Namhae Chemical Co., Ltd. Namhae Chemical Co., Ltd.
Apr. 1989 – Mar. 1990 Pre-Heating, PWHT for hot stove in Casting furnace at PoHang Steel Mill of POSCO POSCO HyunDai Eng. & Const. Co., Ltd.
May. 1989 – Mar. 1990 Pre-Heating, PWHT for hot stove in #3 blast furnace 5th construction at KwangYang Steel mill of POSCO POSCO HyunDai Eng. & Const. Co., Ltd.
Jan. 1990 – Feb. 1990 PWHT for #3 Coaks plant H2S scrubber tank at KwangYang Steel mill of POSCO POSCO TaeSung Const. Co., Ltd.
May. 1990 – Jun. 1990 PWHT for the storage tanks at DaeSan Plant of HyunDai Petrochemical Hyundai Petro-Chemical Co., Ltd. HyunDai Eng. & Const. Co., Ltd.
May. 1990 - May 1990 PWHT for the prewash & WTR wash columns at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG-Caltex Corp.
Jun. 1990 - Jun. 1990 PWHT for Kero-Merox unit columns at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG-Caltex Corp.
Jun. 1990 - Jun. 1990 PWHT for the caustic prewash columns at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG-Caltex Corp.
Sep. 1990 - Sep. 1990 PWHT for the tank nozzle at YeoSu Plant of LGCaltex LG-Caltex Corp. LG-Caltex Corp.
Jun. 1991 – Nov. 1991 Pre-Heating, PWHT for the stove dome used for #4 blast furnace facilities at KwangYang Steel mill of POSCO POSCO Hanjung Corp.
Jul. 1991 – Dec. 1991 Pre-Heating in #4 blast furnace 3rd machinery construction at KwangYang Steel mill of POSCO POSCO HyunDai Eng. & Const. Co., Ltd.
Dec. 1991 – Feb. 1992 Pre-Heating, PWHT for stove dome used for #4 blast furnace at KwangYang Steel mill of POSCO POSCO Hanjung Corp.
Jul. 1992 – Mar. 1993 PWHT for #1 blast furnace body and cooling plate at PoHang Steel mill of POSCO POSCO KeoYang Develoopment Co., Ltd.
Nov. 1992 – Mar. 1993 PWHT for Pressure Vessel for GPP project LG Cables Co., Ltd. LG Electric Wires Co., Ltd.
Dec. 1993. - Mar. 1994 PWHT for tank nozzles at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG-Caltex Corp.
Jan. 1994 – Oct. 1994 Pre-Heating, PWHT in #4 blast furnace 1st repair & maintenance Machinery body construction at PoHang Steel Mill of POSCO POSCO KeoYang Development Co., Ltd.
May. 1994 – Feb. 1995 Pre-Heating, PWHT in Corex blast furnace 3rd construction at PoHang Steel Mill of POSCO POSCO KeoYang Development Co., Ltd.
May. 1997 – Aug. 1997 Pre-Heating, PWHT in #2 blast furnace 2rd repair & maintenance construction at PoHang Steel Mill of POSCO POSCO SamJin Const. Co., Ltd.
Mar. 1997 – Feb. 1998 Pre-Heating, PWHT for #1~#8 unit the turbine shell at BoRyung Thermal power plant Korea Electric Power Corp. ABB-PE
Sep. 1997 – May. 1998 Pre-Heating, PWHT for #5 blast furnace at PoHang Steel Mill of POSCO POSCO SamJin Const. Co., Ltd.
Aug. 2001 – Oct. 2001 Pre-Heating, PWHT in Corex blast furnace hearth Repair & maintenance construction at PoHang Steel Mill of POSCO POSCO SamJin Const. Co., Ltd.
Jun. 2002 – Dec. 2002 Pre-Heating, PWHT in Finex blast furnace Demo Plant Construction at PoHang Steel Mill of POSCO POSCO POSAC Eng. & Const. Co., Ltd.
Jan. 2003 - Dec. 2003 Pre-Heating, PWHT for CITCO project vacuum tower and other vessel Fluordaniel DooSan Heavy Ind. Co., Ltd.
Feb. 2003 - Feb. 2004 Pre-Heating, for Heat Wind Vessel in #2 blast furnace maintenance construction at PoHang Steel Mill of POSCO POSCO SamJin Const. Co., Ltd.
Feb. 2003 - May. 2003 Pre-Heating, PWHT for reactor vessel 6 set in Reliance Jamnagar Complex project Bechtel DooSan Heavy Ind. Co., Ltd.
May. 2004 - Jun. 2004 Pre-Heating, PWHT for TCO Asset Development project Pressure vessel Bechtel DooSan Heavy Ind. Co., Ltd.
Mar. 2005 - Mar. 2007 Pre-Heating, PWHT for Melter gasfier and Reactor in POSCO FINEX #1 installation construction POSCO POSCO Eng & Const. Co., Ltd.
May. 2006 - Jul. 2006 Pre-Heating, PWHT for Tangguh LNG Project Pressure vessel BP Berau Ltd DooSan Mecatec Co., Ltd.
Jul. 2008 - Jul. 2009 NDT for LNG storage Tank Hyundai Mipo Dockyard Co,.Ltd. KangRim Heavy Ind. Co.,Ltd.
Sep. 2008 - Mar. 2010 NDT for HOU #3 Project of Spherical Tank GS-Caltex Corp. S-Tank Eng. Co. Ltd.
Aug. 2009 -Sep. 2009 PWHT for EGB refractories Project SK Chemical SK Chemical
Nov. 2008. – Present NDT unit price contract for manufacture factory of pressure vessel - J-Tech
Mar. 2009 - Apr. 2010 NDT for the pipe in DaeGu district heating Project Korea District Heating Corp. Korea District Heating Corp.
Jun. 2009 – Jul. 2010 NDT for the pipe in SongDo district heating Project Incheon Total Energy Co., Ltd. Incheon Total Energy Co., Ltd.
Mar. 2010 - Dec. 2010 NDT for the pipe in piping relocation Project Korea Gas Corp. Korea Gas Corp.
Apr. 2010 - Dec. 2010 NDT for the Ball V/V Replace Project Korea Gas Corp. Korea Gas Corp.
Jun. 2010 - Oct. 2011 NDT for the pipe in HwaSeong district heating Project Korea District Heating Corp. Korea District Heating Corp.
Feb. 2013 - Dec. 2013 NDT for 2013 year technology service Korea Gas Corp. Korea Gas Corp.
Jul. 2013 -Aug. 2014 NDT for the pipe in Sejong district heating Project Korea District Heating Corp. Korea District Heating Corp.
Aug. 2014 - Dec. 2014 NDT for the pipeline in In-Cheon area Korea Gas Corporation Korea Gas Corporation
Nov. 2014 - Dec. 2015 NDT for the pipeline in Gyeong-Sang area Korea Gas Corporation Korea Gas Corporation
Nov. 2015 - Jun. 2016 NDT for Hyundai steel district heating project Incheon Total Energy Company Incheon Total Energy Company
Mar. 2013 - Mar. 2016 PWHT, NDT for CSP Project Companhia Siderurgica do Pecem POSCO
Aug. 2016 - Mar. 2017 PWHT of pressure vessel for Mexico Salamaca ULSD Project PEMEX DooSan Mecatec Co., Ltd.
Jan. 2015 – Present NDT unit price contract for manufacture factory of pressure vessel KHE KHE
Jan. 2015 – Present NDT unit price contract for manufacture factory of pressure vessel DTS DTS
Feb. 2016 – Present NDT unit price contract for manufacture factory of pressure vessel Hanyang industry co. Hanyang industry co.
May. 2015 – Present NDT unit price contract for manufacture factory of pressure vessel Janghang engineering co. Janghang engineering co.
Jul. 2016 – Present NDT unit price contract for manufacture factory of pressure vessel Si Heung ST Co. Si Heung ST Co.
Aug. 2016 – Dec. 2017 NDT for heating pipe line of yongin branch Korea District Heating Corp. Korea District Heating Corp.
Nov. 2016 – Dec. 2017 NDT for heating pipe line of hwaseong branch Korea District Heating Corp. Korea District Heating Corp.
Jan. 2017 – Dec. 2017 NDT for gas pipe line of Jeonbuk branch Korea Gas Corp. Korea Gas Corp.
May. 2017 – Present NDT for heating pipe line of Anyang area GS Power Co. GS Power Co.
May. 2017 – Jun. 2018 NDT for heating pipe line of Seoul area Seoul Energy co. Seoul Energy co.
Aug. 2017 – Present PWHT unit price contract for manufacture factory of pressure vessel J-TECH J-TECH
Oct. 2017 – Oct. 2017 NDT(PAUT) for water door of Dam of SoYang river K-water K-water
Feb. 2018 – Present NDT for heating pipe line of Incheon Total Energy Company Incheon Total Energy Company Incheon Total Energy Company
Jan. 2018 – Present NDT for DALIM SPECIAL VEHICLE Factory in Vietnam DALIM SPECIAL VEHICLE Co., Ltd. DALIM SPECIAL VEHICLE Co., Ltd.
Mar. 2018 – Present NDT for Daegu, chupungryong, Asan and Kumho bridge DAEHAN OIL PIPELINE Corp. DAEHAN OIL PIPELINE Corp.
Sep. 2018 – Present NDT / PWHT unit price contract for manufacture factory of pressure vessel CURO CURO

5. Heat-treatment & Dry-out by Gas Firing

Period Description Client Contractor
Nov. 1985 - Dec. 1985 PWHT for 6,600 BBL ball type propane tank at YeoSu Plant of LG-Caltex LG-Caltex Corp. HoNam Const. Co., Ltd.
Feb. 1986 - Feb. 1986 PWHT for 6,600 BBL ball type propane tank at YeoSu Plant of LG-Caltex LG-Caltex Corp. HoNam Const. Co., Ltd.
Aug. 1986 - Oct. 1986 PWHT for 8,800 BBL B08/B09, 2 sets of ball type oxygen tanks at #1 Oxygen Plant of KwangYang Steel Mill of POSCO POSCO/
L.A.L/France
ShinHwa Const. Co., Ltd.
Nov. 1987 - Dec. 1987 PWHT for 2 stes of 8,800 BBL ball type oxygen tanks at #2 Oxygen plant of KwangYang Steel Mill of POSCO POSCO/
L.A.L/France
ShinHwa Const. Co., Ltd.
Oct. 1988 - Dec. 1988 PWHT for T-5 Naphtha tank (1,000,000 BBL, 7801-FC) compression ring at SK Corp. SK Corp. SK Corp.
Feb. 1990 - Apr. 1990 PWHT for2 sets of 8,800 BBL ball type oxygen tanks at #3 Oxygen plant of KwangYang Steel Mill of POSCO POSCO/
L.A.L/France
ShinHwa Const. Co., Ltd.
Oct. 1991 - Mar. 1992. PWHT for ball type gas holders at #4 Oxygen plant of KwangYang Steel Mill of POSCO POSCO/
L.A.L/France
ShinHwa Const. Co., Ltd.
Dec. 1991 - Feb. 1992 PWHT for the spherical tanks at YeoSu plant of HanYang Chem Hanyang Chemical Corp. HanKook Fertilizer Co., Ltd.
Nov. 1993 - Mar. 1994 PWHT for ball type tank at DongYang Nylon Corp. Dongyang Nylon Co., Ltd. HanKook Fertilizer Co., Ltd.
Dec. 1994 - Dec. 1995 Heat curing for RFCC project duct and vessel fireresistant material at YeoSu Plant of LG-Caltex LG-Caltex Corp. LG-Caltex Corp.
Jan. 1995 - Jun. 1995 PWHT for LL/HDPE B-1 plant polymerization reactor in Iran Tabriz Petro-Chemical Company Tabriz Petro-Chemical Company ShinHwa Const. Co., Ltd.
Feb. 1996 - Sep. 1996 PWHT for ball type tank at ulsan plant of Taekwang Ind. Taekwang Industry Co., Ltd. SangWon Const. Co., Ltd.
Feb. 1996 - Oct. 1996 PWHT for ball type tank in Corex project at DangJin steel mill of HanBo Steel Hanbo Iron & Steel Co., Ltd. SangWon Const. Co., Ltd.
Jan. 1997 - Aug. 1997 PWHT for ball type tank in #2 NCC project at DaeSan Complex of HyunDai Petrochemical Hyundai Petro-Chemical Co., Ltd. SangWon Const. Co., Ltd.
Sep. 1997 - Mar. 1998 PWHT for reactor, crude column, and other vessel (total 7set) in Jamnagar project Bechtel Hanjung Corp.
Oct. 1997 - Nov. 1997 Dry-out for FCC reactor and stripper fire-resistant material in Jamnagar project Bechtel Hanjung Corp.
Jan. 1999 - Jan. 1999 PWHT for C2 splitter in Singapore Olefins project Kelog Hanjung Corp.
Oct.1998 - Feb. 2000 PWHT for spherical tank (4set) in Mexico Pernex Cadereyta project PEMEX Ingenieria Electrica Y Proyectors
Jan. 2003 - Jan. 2003 Dry-out for refractory lining of a lime calcinations kiln at PoHang Steel Mill of POSCO POSCO POSCO Eng & Const. Co., Ltd.
Apr. 2004 - Apr. 2004 Dry-out for refractory lining of a lime calcinations kiln at PoHang Steel Mill of POSCO POSCO POSCO Eng & Const. Co., Ltd.
Nov. 2004 - Nov. 2004 PWHT for Storage Tank(3set) in Western Libya Gas Project NC41 On-shore Mellitah Plant Construction General Electric Co. HyunDai Eng. & Const. Co., Ltd.
May. 2006 – May. 2006 PWHT for Spherical tank in China LIDONG Aromatics Complex Project GS Lidong Chem. Co., Ltd. GS Eng. & Const. Co., Ltd.
Dec. 2006 - Dec. 2006 PWHT for VCM Spherical tank in LG Chemical LG Chemical Ltd. Hyundai Heavy & Ind. Co., Ltd.
Jan. 2007 - Jan. 2007 Dry-out for refractory lining of DRI feed bin at Finex #1 of POSCO POSCO POSCO
Jan. 2009 - May 2009 PWHT for P2 Project Pressure vessels KCC J-tech & Const. Co., Ltd.
Oct. 2009 - Oct. 2009 PWHT for storage tank in GTL Project Qatar Shell GTL Limited HyunDai Eng. & Const. Co., Ltd.
Aug. 2012 - Sep. 2012 PWHT for Spherical Tank in Habshan #5 UT & OS Project Abu Dhabi Gas Ind. LTD Hyundai Heavy & Ind. Co., Ltd.
Mar. 2013 - Mar. 2016. PWHT for spherical tank in CSP Project Companhia Siderurgica do Pecem POSCO
Mar. 2013 - Jun. 2015 PWHT for spherical tank (6set) in Uzbekistan UGCC UTOS Project Uz-Kor Gas Chemical LLC Hyundai eng Co., Ltd.
Feb. 2016 – Apr. 2018. PWHT for spherical tank (1set) in Kandym Fields Gas Processing Plant Project in Uzbekistan LUKOIL Uzbekistan Operating Company Hyundai eng Co., Ltd.